What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
A. It posts planning results to the database automatically.
B. It propagates exception messages from a component to the finished product.
C. It calculates the delay time which may occur in planning.
D. It triggers multilevel bottom-up scheduling.
What are characteristics of repetitive manufacturing? (Choose three)
A. Period-based planning of the quantities to be produced
B. Production without using production orders and without status management
C. Continuous material consumption, production flow and output
D. Automatic line loading based on capacity limits across all production lines
E. Shop fabrication
Where in the SAP ECC system can you define production versions?
A. In the bill of material
B. In the work center
C. In the material master
D. In the routing
Which of the following statements regarding lot size procedures is correct?
A. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
B. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
C. If a long-term lot size is used, procurement is conducted with a long-term perspective.
D. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)
A. Handling new requirements within the planning time fence.
B. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
C. Handling existing procurement proposals outside the planning time fence.
D. Handling existing procurement proposals within a planning time fence.
Add Comments
Thanks very much for the C_TSCM42_65 dumps. i will work it on to get the best in life. it is so great.
I really felt surprised that i would pass the exam with so high score by using this dumps. I will share this good study material with my friends.
All this dumps are very good, i just did this one and took part in my exam. i really don't believe myself that i have got so high score. Thanks for their dumps.
Nice study material, I passed the exam with the help of it. Recommend strongly.
At first, I don’t think I can pass the C_TSCM42_65 exam. But when I used this dumps, I felt more confident to pass the exam. It is not out of my expectation, i passed the exam with the full score because I met many same question that i have done in this dumps. Thanks these dumps, it is useful.
I have passed the exam with their dumps. Thanks a million!
A very helpful study material, I have passed the exam with the help of this dumps. So i will introduce this dumps to other friend.
So happy. I passed the exam with the help of this material. Good luck to you.
In the morning i received the good news that I have passed the exam with good marks. I'm so happy for that. Thanks for the help of this material.
I'm so glad that I have chosen you as my assistant with my C_TSCM42_65 exam. I passed my exam. Full scored. I will recommend to friends.